| ELECTRICAL AND MECHANICAL PROJECT Metra, Electrical/Mechanical Engineering Services Design and engineering services to upgrade the 18th Street MU Shop and KYD power system, addition of a natural gas powered back-up generator at Van Buren Street Station, upgrade and expand the 47th Street Lower Yard Wayside Power System to accommodate the maintenance and servicing of the train cars, upgrade the UPS system in the Consolidated Control Facility, CADD design drawings, and project administration. (2005). Metra/UPRR West Line Extension to Elburn, Illinois Coordination with ComEd for electrical services, electrical power distribution design, railroad yard high mast lighting design, parking lot, platform, roadway and tunnel lighting design, fire alarm and security systems design. (2001-2003). O’Hare South Airfield Drainage Subconsultant to Parsons Brinkerhoff Construction Services, Inc., Chicago, Illinois. Review of project documentation, field review, coordination with contractor, and final document preparation for mechanical commissioning of pump station at O’Hare. (2002). O’Hare International Airport, Chicago, Illinois – Airport wide engineering coordination services electrical system study to determine the electrical modifications required to support the World Gateway construction program, load and capacity analysis of present facilities, recommendations for relocation of electrical distribution substations, for dedication of additional high voltage feeders and for additional emergency power generation, and construction cost estimates. (2000-2001). Ameritech Stores, Chicago, Illinois Electrical design for a motor oil change facility, including power distribution, lighting, specifications, fire alarm system, kick off meeting, design development, construction assistance and trouble shooting. (1998). Lube Spot, Hickory Hills, Illinois Electrical design for a motor oil change facility, including power distribution, lighting, specifications, fire alarm system, kick off meeting, design development, construction assistance and trouble shooting. (1998). Pullman Bank, Chicago, Illinois Antenna mounting design on an existing Bank building, design and modification of an existing room on the 8th floor for housing telecommunication facility, HVAC design, equipment layout, electrical grounding system, waveguide mounting design and details, electrical power distribution, electrical schematics and emergency generation system for a telecommunication system in Lake Calumet, Illinois. (1995). Western Springs, Illinois Antenna platform and mounting details on an existing water tower, equipment shelter foundation design and layout, electrical grounding system, waveguide and ice bridge design and details, electrical power distribution, electrical schematics, specifications, emergency generation system, utilities and site coordination for a telecommunication facility in Western Springs, Illinois. (1995). Forest Park, Illinois Antenna mounting details on the building water tower roof and on the smokestack. Equipment shelter design and layout inside the tower building, design of catwalk on the existing lower level roof, electrical grounding system, waveguide mounting design and details, electrical power distribution, HVAC design, electrical schematics and emergency generation system for a telecommunication facility in Forest Park, Illinois. (1995). Garfield Park, Chicago, Illinois Antenna mounting details on the smokestack. Equipment shelter design and layout inside the building, electrical power distribution, HVAC design, electrical schematics and emergency generation system for a telecommunication facility in Garfield Park, Chicago, Illinois. (1995). Telecommunication Projects in Illinois and Indiana Antenna monopole tower foundation design, monopole platform and antenna mounting details, equipment shelter foundation, design and layout, electrical grounding system, waveguide and ice bridge design and details, electrical power distribution, electrical schematics, specifications, emergency generation system, HVAC design, utilities and site coordination for the telecommunication facilities in Lemont, Lake Barrington, Itasca, Western Springs, Chicago, South Chicago Heights, Forest Park, Garfield Park, Chicago, and Wheaton, Illinois; and in Springville, Plainfield, and Schereville, Indiana. (1995) . *********************************************************************************** TRAFFIC SIGNALS PROJECT Cedar Road at Illinois Route 30 Subconsultant to Teng and Assoc., Inc. Responsibilities included field investigation/railroad study and surveying report, temporary traffic signal design, proposed responsibilities, traffic signal design, emergency vehicle preemption sequence of operation, railroad preemption sequence of operation, plan preparation, special provisions, and cost estimate. Coordinated the project with railroad and ComEd. Railroad Interconnect and sequences were prepared for one (1) Traffic Signal. (2004-2005). Traffic Signal Modernization Project #5, Various Intersections in Chicago, Illinois Subconsultant to Harry O. Hefter – Associates, Inc. Responsibilites included field investigation/survey, coordination with ComEd for possible power locations, traffic signal design, plan preparation, traffic signal details and standards, special provisions, cost estimate, coordination with Bureau of Electricity, assistance in bid documents, and construction coordination. (2004). 25th Avenue at Belmont Avenue and Franklin Avenue, Franklin Park, Illinois Subconsultant to Clark Dietz, Inc. Responsibilities included field investigation/railroad study and surveying report, traffic signal design, emergency vehicle preemption sequence of operation, railroad preemption sequence of operation, plan preparation, special provisions, and cost estimate. Coordinated the project with railroad and ComEd. We were also responsible for bid documents, shop drawings review, and construction coordination. (2003-2004). Consolidated Rental Car Facility (CRCF) on 55th Street at Midway Airport, Chicago, Illinois Subconsultant to Harry O. Hefter – Associates, Inc. Responsibilites included field investigation/survey, coordination with ComEd for possible power locations, traffic signal design, plan preparation, traffic signal details, and standards, special provisions, cost estimate, coordination with Bureau of Electricity, assistance in bid documents, and construction coordination. (2003-2004). 123rd Street, from Cicero Ave. to Kedzie Avenue Subconsultant to Teng and Associates, Inc. Traffic signal design, emergency vehicle preemption sequence of operation, traffic signal interconnect system, and plan preparation for three (3) traffic signals in Cook County, Illinois. (2004). Maple Avenue, West of Comnor Ave. to IL 83 Subconsultant to Stanley Consultants, Inc. Traffic signal design, emergency vehicle preemption sequence of operation, traffic signal interconnect system, and plan preparation for four (4) traffic signals in DuPage County, Illinois. (2004). |
| ©Copyright 2006, GANDHI & Associates, Inc. All Rights Reserved. Site Designed and Powered by Our IT Team |
