• I-90 from IL 53 to West of IL 72 (Higgins Rd) / ISTHA Contract #I-11-
    4017 and I-90 from East River Rd to West of IL 83 (Elmhurst Rd) /
    ISTHA Contract #I-11-4015.                                           
  • Continuous lighting along the mainline and ramps.
  • Complex Interchange lighting.
  • Tunnel lighting.
  • Decorative pedestrian lighting.
  • Temporary and proposed ITS systems and fiber optic cable.
  • Traffic signal and interconnect design.

  • Reagan Memorial Tollway (I-88), Mile post 113.8 to 139.1, Roadway
    Lighting upgrades and LED retrofit.      
  • Twenty five mile inspection of existing lighting system.
  • Lighting controller evaluation and recommendation for
    upgrades and improvements.
  • Led retrofit of existing lighting along 4.7 miles of I-88.

  • Milwaukee Ave from Addison St to Belmont Ave in ChicagoStreet
    lighting.
  • LED street lighting.

  • Congress Parkway from Wells St to Michigan Ave.
  • Street lighting.
  • Traffic signal.
  • CCTV cameras.

  • Mega bus terminal, w. Congress & Clinton Chicago, IL
  • Electrical demolition, temporary bus terminal and proposed
    lighting.
  • Pavement with crosswalk lighting.
Projects
©Copyright 2016, Gandhi and Associates, Inc. All Rights Reserved. Site Designed and Powered by Our IT Team